MEP Building Services Consultants provided the (Mechanical, Electrical, and Plumbing) design services at the Café Nini facility at RSPCA Llys Nini, Penllergaer, Swansea.

 Here’s a brief summary of MEP design dutiesundertaken:

HVAC System (Air Conditioning):

  • Sizing and designing an efficient heating, ventilation, and air conditioning (HVAC) system to maintain optimal indoor air quality and comfort.
  • Ensuring proper air distribution throughout the facility, considering the unique characteristics of a wooden-clad structure.
  • Integrating energy-efficient solutions and possibly incorporating zoning for different areas within the facility.

Electrical Systems:

  • Designing the electrical distribution system to accommodate the café and event facility’s lighting, power, and equipment requirements.
  • Incorporating lighting design that complements the aesthetic of the wooden-clad structure while ensuring ample illumination for both functional and atmospheric purposes.
  • Evaluating power needs for café equipment, audio-visual systems, and other electrical appliances typically found in a café and event space.

Plumbing Systems:

  • Designing plumbing systems for water supply and drainage, considering the café’s kitchen, restrooms, and other facility requirements.
  • Ensuring water efficiency through the selection of low-flow fixtures and sustainable plumbing practices.
  • Coordinating with the architectural and structural teams to integrate plumbing elements seamlessly into the timber-framed structure.

Renewable Energy Integration (Solar PV System):

  • Assessing the feasibility of installing a solar photovoltaic (PV) system on the roof or other suitable areas to harness renewable energy.
  • Designing the electrical connections and integration of the solar PV system with the overall electrical infrastructure.
  • Ensuring compliance with local regulations and optimizing the solar PV system for maximum energy generation.

Coordination and Compliance:

  • Collaborating with architects, structural engineers, and other stakeholders to ensure the MEP systems harmonize with the overall design and structural elements of the wooden-clad timber-framed facility.
  • Adhering to local building codes, regulations, and sustainability standards throughout the design process.